Process

From the tape to the hang.

Direct exists so a household can order the same product as a dealer, without a shopfront markup. It is not a same-week joinery bench.

01

You measure

Use the guide. A photo of every opening. We query anything that looks tight or out of square.

02

We confirm

Drawing, material, colour, mid-rail, hang. Production does not start until you accept that sheet.

03

Factory builds

Panels are built and frames are cut for that opening. Lead time is the container cycle — usually four to seven weeks.

04

We deliver

Crate to the house. Numbered panels, modular frame, hardware, packers, touch-up. You set the frame and hang the panels, or a local fitter does.

Payment

Deposit to lock the run. Balance before the crate leaves.

A Direct order is made to your sizes. We take a deposit when the drawing is accepted, and the remainder before the shipment is released. Exact split is on the quote.

Freight is quoted to the suburb. Metro capitals are straightforward. Regional and island addresses need a note on the form.

Start with sizes